Gutter clearance
Removing the gutter stop ends to restore the flow and new Classic Bond EPDM rubber cap sheet with white UPVC trims on the bay window flat roof
Gutter clearance
Removing the gutter stop ends to restore the flow and new Classic Bond EPDM rubber cap sheet with white UPVC trims on the bay window flat roof
Gutter and gulley clearance, replacing the broken roof tiles and roof inspection
Strip and re-cover of pitched roof using new eaves guard trays, Proctor’s Roofshield vapour permeable breathable membrane pitched roof underlay, tanalised lath battens, GRP (Glassfibre Reinforced Polyester) valley gutters, Breedon interlocking concrete roof tiles, Lagan angled concrete ridge tiles mechanically secured using dry ridge fixing system and UPVC interlocking dry verge covers system
Stripping off the failed green mineral cap sheet on the bay window flat roof to install new Firestone EPDM rubber cap sheet, textured coated aluminium flashings at the abutment wall and white UPVC trims at the drip edges
Replacing the broken slate and re-pointing the failed mortar on the ridge tiles
Stripping off the bottom courses of concrete roof tiles to carry out repairs to the perished bitumen under felt using eaves guard trays, vapour permeable breathable membrane pitched roof underlay and tanalised lath battens
Installation of new black UPVC round downpipe
Re-pointing the failed mortar at the verges