Re-bedding & pointing the ridge tiles which had been lifted to take the new breathable membrane over the apex of the roof.

 

IMG-20160317-WA0000IMG-20160317-WA0001IMG-20160317-WA0002

 

Stripping off the concrete tiles, ridge tiles & lath battens to carry out repairs to the collapsing perished bitumen under felt using breathable membrane pitched roof underlay. This was installed under the bonding gutter over the party wall which has damp & mould all the way up it inside the property.

 

IMG-20160316-WA0001IMG-20160316-WA0002IMG-20160316-WA0003IMG-20160316-WA0004IMG-20160316-WA0005IMG-20160316-WA0006IMG-20160316-WA0007IMG-20160316-WA0008IMG-20160316-WA0009IMG-20160316-WA0010IMG-20160316-WA0011IMG-20160316-WA0012IMG-20160316-WA0013IMG-20160316-WA0014IMG-20160316-WA0015IMG-20160316-WA0016IMG-20160316-WA0017IMG-20160316-WA0018IMG-20160316-WA0019IMG-20160316-WA0020