Moorcroft Avenue, Golcar

Moorcroft Avenue, Golcar

Strip and re-cover of pitched slate roof using new eaves guard trays, Cromar Vent 3 Pro breathable membrane pitched roof underlay and 25mm × 50mm tanalised lath battens

Bank Foot Lane, Armitage Bridge

Bank Foot Lane, Armitage Bridge

Strip and re-cover of stone tile pitched roof using new eaves guard trays, Cromar Vent 3 Pro breathable membrane pitched roof underlay and 25mm × 50mm tanalised lath battens and re-hanging the stone roof tiles using new aluminium pegs

Wellington Street, Lindley

Wellington Street, Lindley

Strip and re-cover of pitched roof using new eaves guard trays, Cromar Vent 3 Pro breathable membrane pitched roof underlay, 25mm × 50mm tanalised lath battens, GRP (Glassfibre Reinforced Polyester) dry fix bonding gutters over the party walls, interlocking anthracite grey concrete roof tiles and anthracite grey angled concrete ridge tiles mechanically secured using dry fix ridge system plus new skylight window flashing kits

Raking out and Re-pointing the chimney stack plus Lowering and removal of the redundant chimney stack

Knowl Road, Golcar

Knowl Road, Golcar

Lifting, re-bedding and pointing the ridge and hip tiles using new mortar

Installation of new stepped lead flashings at the abutment walls

Raking out and Re-pointing the failed mortar on the chimney stack flaunch, lifting the water table coping stones on the verges to install new DPC membrane and stripping off the flashings, lead soakers and slates at the abutment wall to install new lead soakers and flashings

High Street, Scapegoat Hill

High Street, Scapegoat Hill

Stripping off the concrete roof tiles adjacent to the verges and lifting the lath battens to install new Cromar Vent 3 Pro breathable membrane pitched roof underlay, 25mm × 50mm tanalised lath battens and black UPVC interlocking dry verge covers system plus replacing the lead flashings at the abutment wall using new code 4 milled lead