Raking out and sealing the lead chase on the abutment flashings using polyurethane, Ridge tiles bedded and pointed and lead valley gutters re-pointed

Installation of new black UPVC square line guttering, lifting the ridge tiles and removing the moss growth from the concrete roof tiles