Ukranian Club, Edgerton

Ukranian Club, Edgerton

Sealing the lead gulley.

 

20160310_15552920160310_161147

 

Re-pointing the failed mortar.

 

IMG-20160307-WA0054IMG-20160307-WA0055IMG-20160307-WA0055aIMG-20160307-WA0057IMG-20160307-WA0056IMG-20160307-WA0059IMG-20160307-WA0060IMG-20160307-WA0061IMG-20160307-WA0063IMG-20160307-WA0065IMG-20160307-WA0066IMG-20160307-WA0069IMG-20160307-WA0070IMG-20160307-WA0071IMG-20160307-WA0072IMG-20160307-WA0073

 

Installation of cast iron guttering with new outlet, new downpipes & preparing the external wall for pointing.

 

IMG-20160302-WA0017IMG-20160302-WA0018IMG-20160302-WA0019IMG-20160302-WA0020IMG-20160302-WA0021IMG-20160302-WA0022IMG-20160302-WA0023IMG-20160302-WA0024IMG-20160302-WA0025IMG-20160302-WA0026IMG-20160302-WA0027IMG-20160302-WA0028IMG-20160302-WA0029IMG-20160302-WA0030IMG-20160302-WA0031IMG-20160302-WA0032IMG-20160302-WA0033IMG-20160302-WA0034IMG-20160302-WA0035IMG-20160302-WA0036IMG-20160302-WA0037IMG-20160302-WA0038IMG-20160302-WA0039

 

Scaffold & boarding erected to rake out & re-point the failed mortar and carry out other maintenance.

 

IMG-20160301-WA0001IMG-20160301-WA0002IMG-20160301-WA0003IMG-20160301-WA0004IMG-20160301-WA0005IMG-20160301-WA0006IMG-20160301-WA0007IMG-20160301-WA0008IMG-20160301-WA0009IMG-20160301-WA0010IMG-20160301-WA0011IMG-20160301-WA0012IMG-20160301-WA0013IMG-20160301-WA0014IMG-20160301-WA0015IMG-20160301-WA0016IMG-20160301-WA0017IMG-20160301-WA0018IMG-20160301-WA0019

Knightsbridge Furniture, Bradford

Knightsbridge Furniture, Bradford

Clearing all the debris off the flat roof. Raking out & re-pointing the chase on the ashfelt upstands.

 

IMG-20160310-WA0006IMG-20160310-WA0000IMG-20160310-WA0001IMG-20160310-WA0002IMG-20160310-WA0003IMG-20160310-WA0004IMG-20160310-WA0005IMG-20160310-WA0007IMG-20160310-WA000820160308_11463520160308_11464320160308_11464920160308_11541120160308_11541620160308_11542720160308_12035920160308_12040420160308_12070120160308_12322720160308_12324020160308_14184120160308_14184720160308_14185220160308_14221220160308_14222120160308_14340420160308_14341020160308_143424
Flat roof inspection and clearance. Cast iron trough gutter clearance and repairs.

 

20160307_12150020160307_12153820160307_12155320160307_12160320160307_12161520160307_12162420160307_12163320160307_12165620160307_13354520160307_13584020160307_13584820160307_13585320160307_13591820160307-WA004320160307-WA004420160307-WA0044a20160307-WA0044b20160307-WA004520160307-WA0049

 

Re-rendering the failed areas of old render, sealing the cast iron tough gutter, installation of new stop end, repairs to Trafford sheets & the lead flashings on the lead gulley.

 

20160303_13160820160303_13161120160303_13162320160303_13435620160303_13440120160303_13440720160303_13443120160303_13445320160303_13530520160303_14024220160303_14065420160303_14071320160303_14080020160303_14083020160303_14100020160303_14110020160303_14120020160303_14130020160303_14140020160303_14160020160303_14355320160303_14542320160303_145427

 

Clearing the cast iron trough gutter in preparation for re-lining & repairs to leaking window cill & frame.

 

20160223_13580520160223_13582520160223_13584620160223_13584920160223_13590020160301_000620160301_09234520160302_09240020160302_09250020160302_09260020160302_09270020160302_09280020160302_09290020160302_09300020160302_14411320160302_14412420160302_14412520160302_14412620160302_14413120160302_14413920160302_14414720160302_14415920160302_14421020160302_14432020160302_14553020160302_14553920160302_14554620160302_15162620160302_15164920160302_15171020160302_15172120160302_15173420160302_15174120160302_15174420160302_151753<20160302_152000

Virginia Road, Marsh

Virginia Road, Marsh

Installation of lead flashings, slate repairs, Re-pointing the failed mortar on the ridge tiles, lead valleys & verges and sealing the lead flashings on the cheeks of the dormers.

 

IMG-20160307_153425IMG-20160307-145016 IMG-20160307-153430 IMG-20160307-WA0044 IMG-20160307-WA0044a IMG-20160307-WA0046 IMG-20160307-WA0050 IMG-20160307-WA0052IMG-20160305-WA0010IMG-20160305-WA0009IMG-20160305-WA0007IMG-20160305-WA0008IMG-20160305-WA0006IMG-20160305-WA0004IMG-20160305-WA0020IMG-20160305-WA0019IMG-20160305-WA0018IMG-20160305-WA0017IMG-20160305-WA0015IMG-20160305-WA0014IMG-20160305-WA0013IMG-20160305-WA0012IMG-20160305-WA0011IMG-20160305-WA0022IMG-20160305-WA0027IMG-20160305-WA0026IMG-20160305-WA0025IMG-20160305-WA0024IMG-20160305-WA0023IMG-20160305-WA0021IMG-20160305-WA0005IMG-20160305-WA0028IMG-20160305-WA0029IMG-20160305-WA0031IMG-20160305-WA0030IMG-20160305-WA0001IMG-20160305-WA0032

 

Slate repairs, lifting re-bedding & pointing the ridge tiles, pointing the lead valley, re-pointing the failed mortar at the verges & installation of new breathable membrane pitched roof underlay.

 

IMG-20160303-WA0010 IMG-20160303-WA0011 IMG-20160303-WA0012 IMG-20160303-WA0013 IMG-20160303-WA0014 IMG-20160303-WA0015 IMG-20160303-WA0016 IMG-20160303-WA0017 IMG-20160303-WA0018 IMG-20160303-WA0019 IMG-20160303-WA0020 IMG-20160303-WA0021 IMG-20160303-WA0022 IMG-20160303-WA0023 IMG-20160303-WA0024 IMG-20160303-WA0025 IMG-20160303-WA0026 IMG-20160303-WA0027 IMG-20160303-WA0028 IMG-20160303-WA0029 IMG-20160303-WA0030 IMG-20160303-WA0031 IMG-20160303-WA0032 IMG-20160303-WA0033 IMG-20160303-WA0034 IMG-20160303-WA0035 IMG-20160303-WA0036 IMG-20160303-WA0037 IMG-20160303-WA0038 IMG-20160303-WA0039 IMG-20160303-WA0040 IMG-20160303-WA0041 IMG-20160303-WA0042 IMG-20160303-WA0043 IMG-20160303-WA0044 IMG-20160303-WA0045 IMG-20160303-WA0046 IMG-20160303-WA0047 IMG-20160303-WA0048 IMG-20160303-WA0049 IMG-20160303-WA0050 IMG-20160303-WA0051 IMG-20160303-WA0052

Newsome Road, Newsome

Newsome Road, Newsome

Lifting & re-bedding the hip & ridge tiles using new mortar, installation of eaves felt support trays & repairs to the perished bitumen under felt using breathable membrane pitched roof underlay.

 

IMG-20160229-WA0000 IMG-20160229-WA0001 IMG-20160229-WA0002 IMG-20160229-WA0003 IMG-20160229-WA0004 IMG-20160229-WA0005 IMG-20160229-WA0006IMG-20160227-WA0014IMG-20160227-WA0013IMG-20160227-WA0011IMG-20160227-WA0010IMG-20160227-WA0009IMG-20160227-WA0008IMG-20160227-WA0026IMG-20160227-WA0025IMG-20160227-WA0024IMG-20160227-WA0023IMG-20160227-WA0022IMG-20160227-WA0021IMG-20160227-WA0020IMG-20160227-WA0019IMG-20160227-WA0018IMG-20160227-WA0017IMG-20160227-WA0033IMG-20160227-WA0032IMG-20160227-WA0031IMG-20160227-WA0030IMG-20160227-WA0029IMG-20160227-WA0028IMG-20160227-WA0027IMG-20160226-WA0032IMG-20160226-WA0033IMG-20160226-WA0037IMG-20160226-WA0041IMG-20160226-WA0040IMG-20160226-WA0038IMG-20160226-WA0035IMG-20160226-WA0036IMG-20160226-WA0039IMG-20160226-WA0018IMG-20160226-WA0019IMG-20160226-WA0020IMG-20160226-WA0021IMG-20160226-WA0022IMG-20160226-WA0023IMG-20160226-WA0024IMG-20160226-WA0025IMG-20160226-WA0026IMG-20160226-WA0028IMG-20160226-WA0029IMG-20160226-WA0030IMG-20160226-WA0031IMG-20160225-WA0000 IMG-20160225-WA0001 IMG-20160225-WA0002 IMG-20160225-WA0003 IMG-20160225-WA0004 IMG-20160225-WA0005 IMG-20160225-WA0006 IMG-20160225-WA0007 IMG-20160225-WA0008 IMG-20160225-WA0009 IMG-20160225-WA0010 IMG-20160225-WA0011 IMG-20160225-WA0012 IMG-20160225-WA0013 IMG-20160225-WA0014 IMG-20160225-WA0015 IMG-20160225-WA0016 IMG-20160225-WA0017 IMG-20160225-WA0018 IMG-20160225-WA0019 IMG-20160225-WA0020 IMG-20160225-WA0021 IMG-20160225-WA0022

Cliffe Ash, Golcar

Cliffe Ash, Golcar

Re-dressing the lead flashings & pointing the lead chase.

 

20160225_115445 20160225_115450 20160225_115459 20160225_115508 20160225_115813

 

Installation of new breathable membrane pitched roof underlay at the abutment.

 

20160223_10030420160223_100308 20160223_100319

 

Lifting the water table coping stones on the verge to carry out repairs to the perished bitumen under felt.

 

20160216_134011 20160216_134018 20160216_134027 20160216_134745 20160222_123611 20160222_123616 20160222_13000720160222_123623 20160222_125705 20160222_130002 20160222_130525 20160222_130528 20160222_140732

Station Road, Golcar

Station Road, Golcar

Re-pointing the failed mortar below the window cill.

 

20160222_15513920160222_155206 20160222_155526

 

Installation of newly refurbished cast iron guttering & re-pointing of failed mortar around the dentils.

 

IMG-20160216-WA0000 IMG-20160216-WA0001 IMG-20160216-WA0002 IMG-20160216-WA0003 IMG-20160216-WA0004 IMG-20160216-WA0005 IMG-20160216-WA0006 IMG-20160216-WA0007 IMG-20160216-WA0008 IMG-20160216-WA0009 IMG-20160216-WA0010 IMG-20160216-WA0011 IMG-20160216-WA0012 IMG-20160216-WA0013 IMG-20160216-WA0014 IMG-20160216-WA0015 IMG-20160216-WA0016 IMG-20160216-WA0017 IMG-20160216-WA0018 IMG-20160216-WA0019 IMG-20160216-WA0020

 

Dismantling downpipe to check for blockages with a water test.

 

20160130_153128 20160130_153136 20160130_153449 20160130_154122 20160130_154132 20160130_154222 20160130_154404 20160130_154420 20160130_154521 20160130_154544 20160130_15454720160130_154904 20160130_155645 20160130_160118