Preparing, priming & sealing the flat roof area & upstands around the redundant skylight using polyurethane
Installation of new EPDM rubber cap sheet on the sawdust hopper and removal of redundant flues
Preparing, priming & sealing the flat roof area & upstands around the redundant skylight using polyurethane
Installation of new EPDM rubber cap sheet on the sawdust hopper and removal of redundant flues
Lifting, re-bedding and pointing the concrete angled ridge tiles replacing any that are damaged or broken
Flat roof gulley clearance and sealing the bonds between the steel clad sheets on the parapet wall
Removing the loose stones in the gulleys to restore the flow and sealing the bonds/fixings on the parapet wall copings
Clearing the stone out of the gulley and outlet to restore the flow
Repairs to skylights, upstands and window cills
New Rosemary tiled roof completed with new fascias, soffits, barge boards and rain water goods
Strip and re-cover of Rosemary tiled roof using new vapour permeable breathable membrane pitched roof underlay, eaves felt support trays, tanalised lath battens, code 4 milled lead flashings and concrete tiles