Westbourne Road, Marsh

Westbourne Road, Marsh

Stripping off the concrete roof tiles, lead and slates to carry out repairs to the perished bitumen under felt / wrongly install EPDM rubber cap sheet using vapour permeable breathable membrane pitched roof underlay and re-pointing the failed mortar on the water table coping stones at the verge

High Street, Scapegoat Hill

High Street, Scapegoat Hill

Installation of new under felt adjacent to the dormer cheek where none was present and re-pointing the failed mortar on the gable end wall

 

Ford Drive, Mirfield

Ford Drive, Mirfield

Carrying out repairs to the bitumen under felt over the kick board and installation of new Firestone EPDM rubber cap sheet on the flat dormer roof plus white UPVC trims

Lifting, re-bedding and pointing the ridge tiles using new mortar

Barcroft Road, Newsome

Barcroft Road, Newsome

Removing the redundant air vent pipe

 

Strip and re-cover of pitched roof using new eaves guards, Proctors Roofshield vapour permeable breathable membrane pitched roof underlay, GRP (Glassfibre Reinforced Polyester) dry bonding gutters, tanalised lath battens and Sandtoft Calderdale concrete roof tiles plus rendering the chimney stack and re-pointing the failed mortar on the flaunch.

Laithe Avenue, Holme Bridge

Laithe Avenue, Holme Bridge

Stripping off the ridge tiles, concrete roof tiles and lath battens to carry out repairs to the perished bitumen under felt using vapour permeable breathable membrane pitched roof underlay and tanalised lath battens plus new black UPVC interlocking dry verge covers system

 

St James’s Road, Marsh

St James’s Road, Marsh

Strip and re-cover of pitched roof using new eaves guards, Proctors Roofshield vapour permeable breathable membrane pitched roof underlay, tanalised lath battens, GRP (Glassfibre Reinforced Polyester) dry bonding gutters over the party walls, concrete roof tiles, angled concrete ridge tiles mechanically secured using new dry ridge fixing system and anti corrosion/U.V. coated aluminium flashings at the abutment walls

Netherton Fold, Netherton

Netherton Fold, Netherton

Re-pointed water table coping stones at the verge

Raking out and re-pointing the failed mortar in the bonds between the stone blocks on the gable end wall and slate repairs

Clearing out the gutters, gulleys and flat roof area to restore the flow

 

Hexham Green, Longwood

Hexham Green, Longwood

New black UPVC half round guttering, brackets, unions, running outlet, stop end and round black UPVC downpipe, brackets, off set bends and shoe