Repairs to Trafford sheet roof.
Installation of new lead apron at the abutment & sealing the chase.
Stripping off the concrete tiles & lath battens followed by installation of breathable membrane pitched roof underlay at the abutment. When the original roof was installed the under felt was left too short at the top of the roof where it meets the wall at the abutment.
Sealing the lead gulley.
Re-pointing the failed mortar.
Installation of cast iron guttering with new outlet, new downpipes & preparing the external wall for pointing.
Scaffold & boarding erected to rake out & re-point the failed mortar and carry out other maintenance.
Clearing all the debris off the flat roof. Raking out & re-pointing the chase on the ashfelt upstands.
Flat roof inspection and clearance. Cast iron trough gutter clearance and repairs.
Re-rendering the failed areas of old render, sealing the cast iron tough gutter, installation of new stop end, repairs to Trafford sheets & the lead flashings on the lead gulley.
Clearing the cast iron trough gutter in preparation for re-lining & repairs to leaking window cill & frame.
<
Installation of lead flashings, slate repairs, Re-pointing the failed mortar on the ridge tiles, lead valleys & verges and sealing the lead flashings on the cheeks of the dormers.
Slate repairs, lifting re-bedding & pointing the ridge tiles, pointing the lead valley, re-pointing the failed mortar at the verges & installation of new breathable membrane pitched roof underlay.
Lifting & re-bedding the hip & ridge tiles using new mortar, installation of eaves felt support trays & repairs to the perished bitumen under felt using breathable membrane pitched roof underlay.